Cresting
All our crestings arrive on site pre-fitted and centred saving time for the installer. The cresting interlocks into itself using a male and female water shroud, and now slides into the external locaters on the ridge cap.
Keeping all water levels on the outside of the building and removing the need for holes to be drilled through the ridge top cap.
All the ridge top cappings are pre-cut and prepared for the installer to fit into position. The finial then turn screws into position for a perfect tight fit and without penetration of the roof. |